Realizing the complexity of the design, Armstrong brought in the PROJECTWORKS team to ensure the attention to detail and coordination required for a successful ceiling design and installation.
The use of TEMPLOK ceiling panels reduced the afternoon peak demand by about 30%, enabling the building to operate more efficiently.
Air purification and particulate filtration system with a linear configuration, to clean the air and neutralize harmful contaminants and allergens in a wide array of indoor environments.